AirCooledNut.com

Home > Zoom-zoom > How-to > Apache lift box repair
Reference:  Front gear box
Planetary pin on left side of box (bottom of picture), drive shaft with roll pin is on the right side of the picture.

Reference: Front gear box

Planetary pin on left side of box (bottom of picture), drive shaft with roll pin is on the right side of the picture.

Bus_duct_wrap_013.jpg HID_005.jpg IMAG0836.jpg IMAG1500.jpg IMAG0792.jpg IMAG1486.jpg aero_02.jpg