AirCooledNut.com

Home > Zoom-zoom > How-to > Apache lift box repair
Reference:  Front gear box
Planetary pin on left side of box (bottom of picture), drive shaft with roll pin is on the right side of the picture.

Reference: Front gear box

Planetary pin on left side of box (bottom of picture), drive shaft with roll pin is on the right side of the picture.

aero_3.gif HID_005.jpg 529.JPG IMAG1500.jpg Bus_duct_wrap_013.jpg IMAG0792.jpg IMAG0836.jpg