AirCooledNut.com

Home > Misc > Our storage shed made by Tuff Shed
Finished.  This process took me 4.5 hours to complete but was well worth it.   Now the 4"x4" pressure treated lumber is locked into position.

Finished. This process took me 4.5 hours to complete but was well worth it. Now the 4"x4" pressure treated lumber is locked into position.

shed_site_004.jpg _DSC4540.JPG shed_site_003.jpg shed_building_005.jpg _DSC4665.JPG gallery_06.jpg IMG_3967.JPG